Currently, we find two main solutions or ways to address formwork for industrialized construction processes: two-phase formwork systems and monolithic systems. Below, we analyze the differences between these two types of formwork to understand which one allows us to better optimize all processes.
We conduct a thorough comparison of two-phase industrialized formwork with monolithic systems, highlighting how the former can radically transform the management of such projects by elevating quality levels, reducing execution times, and improving safety on-site.